ANALISIS LALULINTAS PERTEMUAN JALAN RAYA DENGAN LINTASAN KERETA API JALAN URIP SUMOHARJO DI SURAKARTA

Suwardi .

Abstract


Urip Sumoharjo street is represent main road in Surakarta town. The Road which its very solid oftenhappened when there is train which pass by quickly, because the road there is crossed train trajectory apiece of by way is great. When the train pass, the road happened very long queue. From abovementioned problem hence needing analysis about traffic characteristic which its about train trajectory.With analysis meant to give input all related side, so that the road do not happened queue and jam.Target of research is to knowing level service, to analysis the big delay, queue, the big loss when trainmoment pass. The method is used analytical discription. Result of analysis can be concluded asfollows: service level of Urip Somoharja street are mean C and B, the delay train moment pass byquickly mean 178.85 second, amount of queue southerly mean 36.5 smp/trajectory, northwards 39.0smp/trajectory. Amount of delay north and south are 239.34 smp hour/day or 86162.4 smp hour/year.The loss of time if calculated with rupiah equal is Rp. 3.446.498.000,00/year, loss of fuel Rp.39.317.400,00/year, loss of fuel and time equal to Rp. 3.485. 815. 400,00 / year. In range of time 10loss year counted Rp. 34.858.154.000,00/10 year. So that time has come at trajectory woke up with flyover.

Keywords: Delay, Queue, Trajectory Train.


References



Full Text: PDF

Refbacks

  • There are currently no refbacks.